
Our Projects
highlights & milestones
Click on the green dots for more info about the project
first-ever geothermal steam production on the Australian continent
development of a stimulation programm for a 250 MW geothermal field
2020
2010
2000
various services for Germany's first geothermal Lithium project
first-ever hydraulic shear stimulation of a tight gas reservoir
major advancements towards economic viability of EGS technology
investigation on seismic risks in shale gas projects
first-ever seismic Real-Time Monitoring
first-ever full-scope Seismic Risk Analysis for a geothermal project
research on risks related to mining activities
development of guidelines & traffic light systems for induced seismicity
01
Hot-Dry-Rock Projekt Soultz-sous-Forets (France)
Client:
Bundesanstalt f. Geowissenschaften u. Rohstoffe (BGR), Germany
Project Info:
European EGS research project with groundbreaking findings and technological developments
-
Depth 5,000 m
-
Temperature: 200°C
-
Rock type: Granite
-
Development of the "Shear-Fracture Stimulation" concept
-
first EGS pilot plant with commericially viable electricity generation and flow rates
Tasks of Q-con:
-
​Task Leader for Reservoir Stimulation und Hydraulic Testing
-
evaluation and interpretation of hydraulic, seismic and logging data
-
numerical reservoir modelling

the pilot plant

seismic image of the stimulated fracture zone

3D visualization of stimulated zone

the pilot plant
02
Hot-Dry-Rock Projekt
Bad Urach (Germany)
Client:
Stadtwerke Bad Urach
Project Info:
Europe's first HDR research project in a commercially relevant depth/temperature range.
-
Depth 4,400 m
-
Temperature: 170°C
-
Rock type: Gneis
Tasks of Q-con:
-
Design & Planning of Stimulation Measures
-
Conducting the seismic real-time monitoring - for the first time in history
-
Evaluation and interpretation of hydraulic, seismic and logging data




04
EGS Projekt Cooper Basin (Australia)
Client:
Geodynamics Ltd.
Project Info:
-
first publicly listed EGS project developer worldwide
-
successful development of the largest EGS reservoir created by hydraulic stimulation
-
First geothermal steam production on the Australian continent
-
Drilling depth 4,500 m
-
Temperature: 245°C
-
Rock type: Granite
​
Tasks Q-con:
-
Project coordinator
-
Planning of stimulation and test programs
-
Design, installation and operation of the seismic monitoring network
-
Real-Time Monitoring
-
Interpretation of hydraulic, seismic and logging data
-
Numerical reservoir modeling




05
Tight Gas Stimulation (Australia)
Client:
Santos Ltd.
Project Info:
-
first application of shear stimulation technology in the context of a tight gas reservoir
-
Australia's largest hydraulic stimulation campaign
Tasks of Q-con:
-
Design and conceptual planning of the stimulation measures
-
Design, installation and operation of the seismic monitoring network
-
Real-Time Monitoring
-
Interpretation of hydraulic, seismic and logging data
-
Numerical reservoir modeling

Santos, Halliburton and Q-con - ready for stimulation



Santos, Halliburton and Q-con - ready for stimulation
06
EGS Projekt Basel (Switzerland)
Client
Kanton Basel Stadt
Project Info:
-
EGS project for heat and electricity supply in Basel
-
Project cancelled due to perceptible seismic events
-
Depth 5,000 m
-
Temperature: 200°C
-
Rock type: granite/gneiss
Tasks of Q-con:
-
scientific analysis and assessment of the events
-
Project management for the first comprehensive seismic risk analysis of a geothermal project
-
Management of the SERIANEX expert group




07
Shale Gas Projects
(UK and Netherlands)
Client:
Cuadrilla Ltd.
Project Info:
-
Development of numerous shale gas deposits in England and the Netherlands
Tasks of Q-con:
-
seismic risk assessments and hazard evaluations
-
Design, installation and operation of several seismic networks
-
numerical simulations of induced seismicity
-
geomechanical studies

geomechanical modelling for a shale gas project
08
Guidelines
and traffic-light systems
for induced seismicity
(multi-national)
Client:
various ministries/authorities in the Netherlands, Belgium and Germany
Project Info:
Task of Q-con:
-
In cooperation with and on behalf of several international ministries and authorities, Q-con played a key role in the scientific assessment of seismic risks and the development of guidelines and traffic light control systems.
-
Contribution to the position paper "Induced Seismicity" of the Research Association for Physics of the Earth (FKPE)
-
Development of guidelines for dealing with induced seismicity
-
Development of a traffic light system as a response scheme in the event of induced seismicity

mapping of natural and induced seismicity
09
Investigation of cumulative effects due to mining
(Netherlands)
Client:
Ministry of Economic Affairs and Climate Policy, Netherlands
Project Info:
-
Investigation of cumulative effects of various mining activities
-
Research project within the framework of the KEM-48 program
Tasks of Q-con:
-
Investigation of the hazard potential from induced seismicity and ground subsidence​

schematic view of various mining activities
source: TNO
10
Geothermal Lithium Project Lionheart (Germany)
Client
Vulcan Energy Resources
Project Info:
-
geothermal energy production and lithium extraction from geothermal brine
-
several wells in the Upper Rhine Graben
Tasks of Q-con:
-
seismic risk assessments and hazard evaluations
-
Design, installation and operation of the seismic monitoring network
-
Continuous seismic monitoring and real-time monitoring
-
geomechanical studies

Lionheart Project Drillsite Schleidberg
